Phase 1 of 11Lumber, vehicles, and a pickup on a bare plotPhase 2 of 11Curved metal foundation rings on the grassPhase 3 of 11A boom lift raising the first steel archPhase 4 of 11The steel frame going up, with boom lifts on the sitePhase 5 of 11The long steel frame, with people on the sitePhase 6 of 11A boom lift beside the frame as the fabric goes onPhase 7 of 11The fabric building standing, with a red pickup beside itPhase 8 of 11A rainbow over the finished fabric buildingPhase 9 of 11Interior framing, drywall, and cable spoolsPhase 10 of 11The interior with hanging light fixturesPhase 11 of 11Interior benches and fans in the finished rooms
Journal
Oso construction
A construction progression, from a bare plot to the finished fabric building.
These eleven photographs are in construction-phase order, from the first work on the plot through the finished interior. Use the numbered timeline to jump to a phase. The fabric building in the workshop’s open bay door is part of the illustration; these are the real photographs.